Pictures from November 2004

I finally started tiling the bathrooms.  I have put this project off for a long time because I had such a negative experience doing the first phase.  I started with the smaller, second bathroom so I could use it as a warm up to do the master bath.  I did this entirely by myself while Ali was at work.  I got it laid in 4 or 5 hours and then grouted it the following day. I was a bit worried about the logistics of removing and reinstalling the toilet but it was less of a big deal than I thought it would be. It looks good. There also is a picture of the cheesy E-Bike we got for Ali. Hover over images for a text description. Click on thumbnail to see larger image.

Laying the tile out "dry" to establish my cut pieces All tile laid out dry, all cuts made Another view of the tile laid out
The toilet back in place After initial grouting After the grout has been wiped down